Skip to content

An open production standard · Edition 1.0

Design, construct and operate as one production system.

Design, construct and operate as one production system. Open at the interface. Measured at the gate.

An open production standard for buildings: three loops, two releases, twelve steps under one contract, four metrics.

The bottleneck

The loss shows up on the jobsite. It starts upstream.

A building passes through nine production stages in five groups, and only two of them sit on the jobsite. At each handoff the record is re-keyed by hand into the next firm’s system. The question written on site crossed a border between firms, and the answer has to come back the same way.

Five production groups, today re-keyed at every handoff, and with one shared record keyed the same at every handoff
FIG 00. Today the record is re-keyed at every border. The standard asks for one record, keyed the same at every handoff.

The production system

Three loops, two releases, twelve steps, one contract.

Software runs two loops joined by one release. Construction runs three: design, construct and operate, joined by two releases, issue for construction and handover. Each loop already iterates well inside its phase. What breaks is the interface between loops, where the record is re-keyed, and the path from operations back to design, which barely exists as data.

operating data that should feed the next designRelease 1issue for constructionConstructplan, build, capture, verifyRelease 2handoverOperaterun, monitor, maintain, learnDesignmodel, test, coordinate, issue
Three loops, each iterating inside its phase; the record crosses between firms at the two releases.

The same contract organises every step. Read the twelve steps, what crosses each gate and who holds it, on the standard page.

What already implements it

Most of it exists as open standards. Three rows are the work.

Mapped against the twelve steps, the standards community already ships most of the production system: IFC for open model data, IDS (Information Delivery Specification) for machine-checkable requirements, BCF (BIM Collaboration Format) for issue exchange, bSDD (buildingSMART Data Dictionary) and ETIM (the open product classification model) for classified products, COBie (Construction Operations Building information exchange) for handover. Three rows are missing or partial: a shared release gate, the specification-to-product crosswalk, and the operate-to-design loop.

2 of 3cross-firm handoffs that stay manual when a market is split across three platforms that do not share records (estimate)LuhTech Holdings, DesConOps (2026), chapter 3: a market split evenly across three platforms that do not share records leaves two of three cross-firm handoffs manual (2026-10-05)

Where to start

One first step for each of six roles

Status

First edition, October 2026. The working group is forming.

The standard’s definitions are published as JSON Schema and dated edition records, served at their own address, under the Apache License 2.0, stewarded by LuhTech Holdings and built to be handed on. No conformance programme exists; the standard endorses no product. The first working-group agenda is set from the answers to three questions.