An open production standard · Edition 1.0
Design, construct and operate as one production system.
Design, construct and operate as one production system. Open at the interface. Measured at the gate.
An open production standard for buildings: three loops, two releases, twelve steps under one contract, four metrics.
The bottleneck
The loss shows up on the jobsite. It starts upstream.
A building passes through nine production stages in five groups, and only two of them sit on the jobsite. At each handoff the record is re-keyed by hand into the next firm’s system. The question written on site crossed a border between firms, and the answer has to come back the same way.
The production system
Three loops, two releases, twelve steps, one contract.
Software runs two loops joined by one release. Construction runs three: design, construct and operate, joined by two releases, issue for construction and handover. Each loop already iterates well inside its phase. What breaks is the interface between loops, where the record is re-keyed, and the path from operations back to design, which barely exists as data.
The same contract organises every step. Read the twelve steps, what crosses each gate and who holds it, on the standard page.
What already implements it
Most of it exists as open standards. Three rows are the work.
Mapped against the twelve steps, the standards community already ships most of the production system: IFC for open model data, IDS (Information Delivery Specification) for machine-checkable requirements, BCF (BIM Collaboration Format) for issue exchange, bSDD (buildingSMART Data Dictionary) and ETIM (the open product classification model) for classified products, COBie (Construction Operations Building information exchange) for handover. Three rows are missing or partial: a shared release gate, the specification-to-product crosswalk, and the operate-to-design loop.
Where to start
One first step for each of six roles
Status
First edition, October 2026. The working group is forming.
The standard’s definitions are published as JSON Schema and dated edition records, served at their own address, under the Apache License 2.0, stewarded by LuhTech Holdings and built to be handed on. No conformance programme exists; the standard endorses no product. The first working-group agenda is set from the answers to three questions.
DesConOps definitions, schemas, crosswalks and edition records: Apache License 2.0. The paper: © 2026 LuhTech Holdings LLC.